Category

Case Studies

Drummoyne Cricket Nets

By | Case Studies

 

Sydney Cricket Club had an issue on site with the building of their new nets for their turf practice wickets. The columns needed a solid base, but the ground was full of rubble and rubbish. Enter the Bulldog, working in a narrow work site and keeping away from the turf wickets, we were able to drill the bases from our narrow footprint.

 

 

Blackwattle Bay High School

By | Case Studies

We drilled and poured foundations for the new balcony extension at the Blackwattle Bay High School.

The piers were required close into the existing building and into ground that could was black, highly odourous and full of rubble. Due to being close the existing sea wall, the shoreline had moved over time, creating very difficult ground conditions.